Brakes and Pipes

Today mainly concentrated on the chassis all the brakes and new pipes are built fabricated and on as are the anti roll bars, the starter and a few sundry items plus took the masking of the body still looks.

Also got the fuel pump cleaned painted and fitted plus a new fuel filter,, started to run the fuel lines glassed the inside of the near side footwell where i have removed the battery fuses and there box,got the pedal box in and the front antiroll bar, finally sorted colours etc with the trimmers got the dial faces to the folk making the new ones even got orange tvr logo on every dial.

antirollbar propshaft

brakecompensator brakelines

brakes frontbrakes

frontbrakes2 rearbrakes

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s