Today mainly concentrated on the chassis all the brakes and new pipes are built fabricated and on as are the anti roll bars, the starter and a few sundry items plus took the masking of the body still looks.
Also got the fuel pump cleaned painted and fitted plus a new fuel filter,, started to run the fuel lines glassed the inside of the near side footwell where i have removed the battery fuses and there box,got the pedal box in and the front antiroll bar, finally sorted colours etc with the trimmers got the dial faces to the folk making the new ones even got orange tvr logo on every dial.