Got lots of the Emerald wiring done all the injectors which have been threaded through the valley then up through the holes I machined all those weeks ago to keep it as neat as I can,all the coil packs again up through the holes from the valley, the trigger wheel sensor all in there respective conduits plus I have soldered all the joints as the crimps seem fine but you never know. Also fitted all the blower pipes to and from the intercooler,alternator bracket, the catchment tank bracket and tank, I have fitted the heat shields I made to extend the protection along the inner wings, looking quite busy under there now.