More Details

Good day today with much better weather so doors open on the workshop. I got the sound proofing on the inside of the bonnet, routed and plugged in the triple position switch for the Emerald, sanded masked and painted the bezels on all the gauges now the clock is back, started getting the scuttle ready to fit tomorrow. I also polished the new cap for the brake reservoir and sealed round the brake fluid reservoir and also blanked of the inner wings to outer wings to stop the draughts and started to get the side lights remounted. Fitted the temporary rear number plate I also took delivery of the charger that is going to be installed permanently to keep the battery in peek trim.

rear_zps8b676ed8 gauges34_zpsdf591465
gauges_zps721fbc20 bonnet_zpsb7c4dd7a

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s