Fair bit done up to today fuel pump, filter all piped in and fixed, starter and clutch slave fitted strangely had to ease the starter holes to rotate the starter slightly to get the solenoid away from the manifold down tube same manifold that came off perhaps it had been that way all along, then concentrated on the fuel rail rebuilt the injectors and there holding clamps put the pressure reg and all the nicely painted bits together and piped it all up. I have got to machine a new hose tail for the plenum water jacket below the butterfly as one was badly corroded so I have drilled them out and going to turn two new stainless items also turned up an adaptor and fitted nice little filter to the near side rocker cover,and have painted all the throttle linkage and brackets ready for the plenum.