Cerbera Exhaust Manifold – Part 2

Got on well Friday made the third mounting for the nearside exhaust there seemed to be to much twist from the weight of the silencer with just the two, then started back on the offside got the manifold all tigged up, lobsterbacked the bend after the flexy down pipe, cut and dressed the exit bend and cut the straight pipe to length, just the welding on that and the mounts Monday then engine out and prepare for the dyno.

Wedge Update

Got a bit done to the wedge roll bar is now complete with harness attachment points off to powder coat next week also completed the setup on the rear suspension got the new shocks on and set the camber and toe in also sorted the seats I am using chimaera seats seem to go in well next is to sort the dash centre console etc.

24183692491_8ee5b1aba3_k