Got on well Friday made the third mounting for the nearside exhaust there seemed to be to much twist from the weight of the silencer with just the two, then started back on the offside got the manifold all tigged up, lobsterbacked the bend after the flexy down pipe, cut and dressed the exit bend and cut the straight pipe to length, just the welding on that and the mounts Monday then engine out and prepare for the dyno.