Fair bit more done, started on the front arb (anti-rollbar) and have finished fitting the support brackets, also finished fitting the steering rack had to do a chassis mod to get the pinion of the rack exactly where it is needed to avoid any bump steer etc.all getting very snug up front, i have sourced the material for the arb levers and cut to lenght they are now away being taper turned as my old capstan cant taper turn so should have them back next week.
Category Archives: Chassis
Cerbera Rollbar manufacturing – Part 2
Rollbar manufacturing
Well back on track finished the mounting brackets for the rollbar also now fabricated the mountings on the chassis for them and started machining the ends of the bar itself which will be sweated into the tube to create solid ends for the link arms to fit into i have built up both rear suspensions to get the length of the drive shafts needed plus have made and fitted the diff carriers to the chassis so the rear end is nearly complete.
Completing the Wedge – Part 1
Got a fair amount done in the last couple of days filled in the drivers side hole in the rear bulkhead made good round the roll bar fixings to the chassis behind the seats, finished the wiring to the new electric power steering refitted the gearstick and its rubber gaiter refitted the heater controls and I have run a bigger negative for the general electrical equipment particularly for the windows, fitted the number plates and the TVR logo to the front and the secondary 350i lettering plus cut back and polished the front half of the car,also fitted the harness mounts to both sides.
TVR Wedge Rear Suspension Upgrades
Been busy again today got all the rose joints sorted and there spacers made for the last bit of the rear suspension mods to allow full adjustability plus set a 1.0degree of camber as a start point, all looks good so far proof is in the driving reports to follow in around a month, fitted the new steering wheel I had in stock to the electric powered steering column plus the new proper bearing in the front footwell bulkhead and adjusted the centring so the winkers return after the appropriate movement of the wheel,started filling the holes in the rear bulkhead where the speakers had been why would you want a radio in a car such as this, plus started refitting the bonnet, fitted the two exhaust tail pipes after polishing.
Finished TVR Wedge Roll Bar
After fitting the rollbar I have decided to get all the internal panels like the dash and centre console coloured the right colours namely black and white, so i already had the furniture clinic materials in stock so and have set to work cleaning and scrubbing off the old dark blue colour its not actually to bad the leather prep is very active and soon softens the old finish and colour then sponge and spray the new colour and finish, I have chosen satin,so far so good the white obviously takes a lot longer to cover but i am very pleased with the result, I have also turned some centres with a groove to allow a little more movement on my adjustment to the rear suspension will be assembling that tomorrow so pics to follow.
Wedge Update
Got a bit done to the wedge roll bar is now complete with harness attachment points off to powder coat next week also completed the setup on the rear suspension got the new shocks on and set the camber and toe in also sorted the seats I am using chimaera seats seem to go in well next is to sort the dash centre console etc.